Plant Manager
Ankhu Khola Jalvidhyut Company Limited is a leading hydropower developer in Nepal, committed to sustainable energy production. The company operates the Ankhu Khola Hydropower Project, a vital contributor to Nepal’s renewable energy sector. Located in the scenic Dhading District, the project harnesses the power of the Ankhu Khola, a major tributary of the Budhi Gandaki River, to generate clean electricity for the national grid.
Project Details
-
Location: Ringne, Tripura Sundari, Dhading District (132 km from Kathmandu)
-
River Source: Ankhu Khola (catchment area: 633 km²)
-
Hydrology: Mean annual flow of 58.38 cumecs, with a design discharge of 34.5 cumecs
-
Operational Focus: Run-of-the-river (ROR) hydropower generation
Position: Plant Manager
We are seeking an experienced Plant Manager to oversee the daily operations, maintenance, and management of the hydropower facility. The ideal candidate will have a strong background in electrical engineering, hands-on experience in hydropower plant operations, and leadership skills to manage on-site teams effectively.
Key Responsibilities
-
Plant Operations & Supervision
-
Ensure smooth and efficient functioning of the hydropower plant.
-
Monitor turbine, generator, and electrical systems for optimal performance.
-
Supervise shift operators and maintenance staff to maintain 24/7 operations.
-
-
Maintenance & Repairs
-
Plan and execute preventive and corrective maintenance of electro-mechanical equipment.
-
Troubleshoot electrical/mechanical faults and coordinate with technicians for timely repairs.
-
Ensure compliance with Nepal Electricity Authority (NEA) and Department of Electricity Development (DoED) standards.
-
-
Technical & Quality Control
-
Review engineering drawings, schematics, and manuals for maintenance activities.
-
Conduct inspections to ensure work aligns with design specifications and safety protocols.
-
Maintain detailed logs of maintenance, outages, and performance metrics.
-
-
Team Leadership & Coordination
-
Lead a team of engineers, technicians, and support staff.
-
Conduct training sessions to enhance technical skills and safety awareness.
-
Liaise with head office, contractors, and government authorities for regulatory compliance.
-
-
Safety & Compliance
-
Enforce strict adherence to Occupational Health & Safety (OHS) guidelines.
-
Conduct risk assessments and emergency response drills.
-
Ensure environmental regulations are followed to minimize ecological impact.
-
Qualifications & Experience
-
Education: Bachelor’s degree in Electrical Engineering (recognized university).
-
Experience: Minimum 4 years in hydropower plant operations/maintenance (preferred).
-
Technical Skills:
-
Proficiency in SCADA systems, PLCs, and switchgear operations.
-
Knowledge of Nepal Grid Code and power evacuation systems.
-
Ability to interpret single-line diagrams (SLDs) and P&ID drawings.
-
-
Soft Skills:
-
Strong leadership, problem-solving, and decision-making abilities.
-
Excellent communication in English & Nepali (report writing, meetings).
-
About Ankhu Khola Hydropower Site
The Ankhu Khola Jalvidhyut Project is located in Dhading District, approximately 132 km from Kathmandu. Ankhu Khola, a major tributary of the Budhi Gandaki River, has a catchment area of 633 km² and an estimated mean annual flow of 58.38 cumecs. The project utilizes a design discharge of 34.5 cumecs with a probability of exceeding 40%.
Why Join Us?
-
Competitive Salary: Negotiable based on experience (no bar for deserving candidates).
-
Career Growth: Opportunity to lead a critical hydropower facility in Nepal.
-
Work Environment: Dynamic team with a focus on innovation and sustainability.
Application Process
-
Deadline: May 17, 2025
-
How to Apply: Submit a CV, cover letter, and relevant certificates via the company portal.
-
Selection: Only shortlisted candidates will be contacted for interviews.
-
Note:
-
The company reserves the right to accept/reject applications without explanation.
-
Canvassing will result in automatic disqualification.
-
No phone calls or email inquiries.
-
About Dhading & Work Conditions
-
The project site is in Tripura Sundari Rural Municipality, offering a serene but remote work setting.
-
Basic accommodation may be provided for the Plant Manager.
-
Travel to Kathmandu for meetings may be required occasionally.
Final Note
This role is ideal for an ambitious engineer seeking a leadership position in Nepal’s hydropower sector. If you meet the criteria and are ready to take on this challenge, apply before the deadline.